St. Ignatius of Antioch Church

 

The Krueger Group completed the installation of a long over due 3-stop elevator and enclosure at the St. Ignatius of Antioch Church in Cleveland, Ohio.  Partially built into the churches former coal bin, the structure was designed to honor the churches history and architectural integrity while eliminating the functional obsolescence of a building that was built in the early 1900’s.

Design features include:

  • 3-stop Limited Use Limited Access (LULA) elevator servicing the church and church hall.
  • Exposed concrete foundation and storefront glass structure.
  • Stair access to church and basement from street level.
  • Safety railings constructed out of reclaimed church pews.
  • Existing interior entry doors into church were harvested and used as the main entry doors to the church from the elevator tower.
  • Terrazzo flooring to match existing.
  • New ADA bathroom.

ClientSt. Ignatius of Antioch Church
TypeCommercial,Nonprofit
ServicesPreconstruction,Design/Build,Construction Management
LocationCleveland, Ohio
Completion2015
ArchitectLS Architects
Project Blog View Blog »
PhotographerCarl Staub
             

Before & After

Move the slider to the left or right to view

 

Related Projects